The concrete slab has been poured and last night I added the block and mortar. Though I am no mason (neither "social club" nor craftsman), I think it turned out well. The mortar had the consistancy of wet sand, and in my mind would dry as such. I trust it will turn out fine. I just kind of slapped some on there and put down the block, trying to squeeze in some mortar between the blocks, if I could. It was a very tight fit.
Unfortunately, my head had a few obscenities floating around as I hit my head and back many-a-time on the fireplace. MAN, I am ready for this thing to be done! It was a small space when I first started... It is even smaller and more frustrating now! I can only mortar from ONE side, the interior. As great as it would be to low-crawl a bucket of mortar under the house... I think I may just let it be.

WHAT IS NEXT: Once this stuff hardens, my next step is to measure and install a gas line. I will need the measurements and have a good idea where I need my couplings and angles. I will take those to Lowes, have them cut and thread... and I anticipate it will take 3 trips to get it correct. I will have to have the gas company turn off the gas so I can put in a valve off of which to work. Theoretically (not the time for theory, I know) I should be able to have the gas turned back on, once the valve is installed. I can then install the threaded pipe with pipe wrenches, pipe-dope and some elbow grease, and more pipe-dope. I will need my trusty hammerdrill and a masonry bit to make my holes through the house and the cinder-block. Once my gas-line is installed, I will support it with metal hangers and will fill the fireplace with 57-stone and leave approximately 4-6 inches for concrete. My gas line will be capped and have a plastic bag over it with duct-tape to keep it pretty. Once the concrete is level and I have measured and compensated for the granite harth we will install, I will let it harden, while keeping it a little moist so it will not crack. "WAH-LAH!" (I don't speak French! ...Voi La? Viola? Whatever!) I may stain/protect the concrete somehow... THEN we should be able to install the gas logs... YEEHAW! Simple, RIGHT!?!?! WRONG! ---PAIN IN THE ARSE!
15 January 2007
The first project to frustrate us was the hardwood floors. It turns out that we had active
termites in our floors. The exterminator sprayed and finally eradicated them. During Christmas weekend, when family came down, Ron, Howell, Bobby and I worked on the floors and were able to get in the new boards prior to lunch! I am very pleased. I still have yet to sand them down and redo the whole floor so it all matches... but we have a floor!
The next project was more of a want than a necessity. Though I could argue that a good, solid work bench is necessary, having a floor does take precedence. I decided to make this thing very substantial. I used regular pine for the framing and pressure treated 4x4s for the legs with solid 2x10s for the top. I am quite pleased with it. It offers a great work area and also a way to organize all my junk. Well... most of it. It is 8 feet long and I have argued that should we ever have to shelter refugees, this could also double as a bunk bed for 2 adults, or 1 adult and 2 children or 4 children... ANYWAY. It is the first project for making my shop. All I need now is MORE TOOLS!
The most recent (and current can of worms) is replacing the floor of our fireplace. It all started
with the harth being uneven... so being the investigatory craftsman that I am, I survey the underlying cause... the verdict, lowsy fix-menship. It is half-collapsed under the house and I remove most of it by hand. I procede to knock the rest out with a sledge hammer and now have a giant HOLE in my floor... this time it goes ALL THE WAY to the dirt!
I plan on pouring a slab of concrete, letting it set-up a bit, ancor the cinder-blocks in it, mortar the blocks, fill at least 75% of the space with "57-stone" and top it off with concrete leaving a lip so I can put granite in the harth.
THE PROBLEM, however, is that two floor joists are so eaten by termites that I removed most of it with my hand! So, now the fireplace project is on hold until I can get my hands on a reciprocating saw to cut out the bad boards, then I need to insert NEW boards (pressure treated). Once I get those secured, I need to jack up my floor and put supports under the new boards... Once this is accomplished... THEN I can begin my fireplace project. Until then we have another hole in our floor...
WHEN WILL IT END?!?!
07 January 2007

While we were in Asheville, Onna and I had talked about the strong possibility of moving up to Asheville after Onna finishes her Midwife Apprenticeship and I finish Paramedic school. My school start date, however, has been delayed yet again. It was originally scheduled to start 4 Dec 06 and was bumped to 8 Jan 07 (tomorrow). Now, they do not know WHEN it will start, but estimate some time in March. The problem lies, I believe, in the paperwork needed to go through at Midlands Technical College. We are the first Paramedic class, here, taught by Midlands EMS but also receive college credit at Midlands Technical College. Though I would love nothing more than to start Paramedic school, I will more appreciate having 36 credits paid for, and applicable toward a degree.
Though we know we cannot make a move until we are finished with our schooling, Onna and I are looking at land on which we can build our hay-bail house. We are thrilled at the possibility of owning a few acres in the mountains, but are intimidated at the reality of finances, etc. We will go where the Lord leads, but we will plan on the possibility of moving to Asheville within the next few years.